Western Washington University New Residence Hall-Outreach Meetings, Seattle Jan. 29, Everett Jan. 30- 5-7pm

Western Washington University (WWU) has experienced significant enrollment growth in recent years and is planning to continue this growth over the next several years. They are building a New Residence Hall.Project Schedule:

Outreach Meetings Seattle J

• Bid Packages Released: February 3, 2020
• Bids Due: February/March 2020
• Construction Commences: January 2020
• Construction Ends: June 2021

For more informaitoonWWU Residence Hall Outreach Flyer_2020.01.16_v4 (002)

Pease & Sons, Inc- SUB-BID REQUESTED FOR TOLEDO HIGH SCHOOL, Pre-bid meeting 12/10/19, 9am at Toldeo High School, Bid due, 1/14/20

Pre-Bid Meeting: Tuesday, December 10, 2019 @ 9:00am @ Toledo High School, 1242 SR-505, Toledo, WA 98591. Meet @ Front Desk.
• Attendance is NOT mandatory for subcontractors/suppliers.
Project Description: The existing gymnasium, shop facilities, and outline of the commons area will be remodeled with approximately 30,000 sqft of new construction. Additions include classroom spaces, kitchen facilities, and the athletic facilities attached to the gym. Estimated Value: $19.18 million. Click the link for more information Pease and Sons Request for Sub-bid Ad – Toledo HS

Pease & Sons, Inc- Sub-Bid Request for WASHINGTON STATE MILITARY DEPARTMENT CENTRALIA READINESS CENTER IMPROVEMENTS- Bids Due 9/5/19 @ 3:00pm

Site Visit: Thursday, August 29, 2019 anytime between 8:00am – 5:00pm @ 309 Byrd St, Centralia, WA.

Project Description:
Alterations and an addition to an existing 32,088 sqft, 3-story armory. The armory was originally built in 1938. The 3-story (1,200 total sqft) addition is being constructed to provide an accessible route to all floors of the bldg. Includes the elevator/ramp & stair addition and storm sewer serving it. Utility improvements include refeeding the bldg with 3-phase power. Installation of a new undergound fire water supply and domestic water service crossing Byrd St. Retrofitting the bldg with automatic sprinkler and fire alarm and detection systems. Replacement of the windows and entry assemblies. Alterations to the basement together with mech and elec improvements to support the addition and altered spaces. Limited structural repairs at east window heads. Finish repairs to entry stair wall and landings and the replacement of the guards and handrails.
Estimated Value: $2.995 – $3.310 million

For more information Pease and Sons Centralia Readiness Center – Request for Sub-bid Ad.

Kiewit I-5 & SR 548 California Creek Fish Passage- DBE/UDBE & Small Business Outreach Event Aug. 22, 1-3pm- Bellingham

All qualified design firms, subcontractors and suppliers, including small and disadvantaged businesses, wanted to help compete for design, and build I-5 & SR 548 Tributaries to California Creek Fish Passage Project.

Learn more about design, subcontracting and material supply opportunities.

Construction Needs: Traffic Control, Trucking, Vibration Monitoring, Survey, Landscaping, Street Sweeping, Pavement Marking, Erosion Control, Fish Exclusion, Equipment Rental, Cable Fencing, Signage. Guardrail,  Aggregates. Lightweight Aggregates, and Paving. For more information click the link: Kiewit Outreach Event Flyer August 22

Whatcom Transportation Authority (WTA) RFQ On-Call Architect & Engineering Services Due Sept. 5 2019, 12:00PM PST

 

WTA intends to award a master agreement to the most qualified professional Architectural and Engineering firm (Firm) capable of providing on-call multi-discipline architectural and
engineering services for various, potential WTA projects within Whatcom County,Washington. Qualifications due: September 5, 2019, No Later Than 12:00 PM PST. Click link for complete RFQ document. Whatcom Transportation Authority 2019 – 252 RFQ Architect and Engineering