more information can be found at http://www.bxwa.com/bxwa_toc/pub/272/lfp1_pfingst_animal_acres_park_11250/info.php. There is a non-mandatory pre-bid site inspection Wednesday March 4th at 10am. Questions are due March 10th and bids are due March 17th at 2pm.

The A/E estimate is $150,000. The project includes a slab on grade, concrete columns with a stone finish, and wood framed metal roof. Light fixtures and receptables will be connected to an existing subpanel. The scope includes a yard hydrant and trenching for associated plumbing. All work takes place in a critical area (wetland buffer), and planting, fencing, and coir logs are included in the mitigation plan. The project is scheduled from April 2020 to July 2020.